Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling

Project Description: To meet the increasing traffic needs of the Tolo and Fanling Highways, Ozzo was asked to assess prior traffic conditions, provide temporary traffic arrangements to facilitate, the widening construction on both Tolo and Fanling Highways. Projects: Contract No. HY/2009/08, Widening of Tolo Highway/ Fanling Highway between Island House Interchange and Fanling Project Type:  Temporary…

Section 16 Planning Application for Proposed Temporary Shop and Services (Convenience Store and Showroom) and Storage Use at Au Tau, Yuen Long

Project Description: Ozzo and Toco have successfully seeks the permission of the Town Planning Board in within 2 months to allow the provision of a retail shop and convenience store, showroom for the Intelligent Traffic System (ITS) facilities, storage of temporary traffic management implementation services at Au Tau, Yuen Long. Projects: Section 16 Planning Application for…

Traffic Impact Assessment for the Project of 053WS – “Uprating of Chai Wan Salt Water Supply System”

Project Description: Chai Wan salt water supply system has nearly reached the designed capacity limit, so the system must be upgraded in order to provide adequate and reliable supply to ChaiWan and Siu Sai Wan. Ozzo was commissioned by the Water Supplies Department (WSD) of the Government of the Hong Kong Special Administrative (HKSAR) to carry…

Agreement No. NTE/01/2016 Engineering Feasibility Study for the Establishment of an Agricultural Park

Project Description: Ozzo undertook a Traffic Impact Assessment (TIA) study in support of the Agricultural Park Feasibility Study. The study focused on assessing existing conditions, estimating the future traffic volume generated by the proposed development, general traffic forecasting, determining overall traffic impact brought about by the proposed development, advising on access arrangements and providing a complete…

Rezoning Application Proposed Custom & Excise Staff Quarter at Area 123 in Tseung Kwan O

Project Description: Ozzo was commissioned to undertake a Traffic Impact Assessment (TIA) Study to support a planning application to construct the Departmental Quarters (DQ) for the Customs & Excise Department (C&ED) at Tseung Kwan O. The study assessed the traffic impact to be induced by the proposed development by reviewing existing traffic conditions, estimating potential…

Contract No. FSD/C07/2015 – Rezoning Application for Reprovisioning of Chai Wan Ambulance Depot

Project Description: In order to redevelop the Chai Wan Ambulance Depot, the Fire Services Department has submitted an application to the Town Planning Board (TPB) to request relaxation of building height restriction from the prevailing outline zoning plan, Ozzo was commissioned to conduct a Traffic Impact Assessment with the following objectives: review the existing traffic…

Contract No. DC/2010/03 – Kai Tak Nullah Improvement Works

Project Description: Ozzo is delighted to provide independent traffic consultancy services for Kai Tak Nullah Construction across Prince Edward Road East. The scope of work for this project include design of extensive Temporary Traffic Management Schemes (TTMS) and associated Traffic Impact Assessment (TIA) study. The scope of works include traffic data collection to facilitate traffic…

Replacement of the Traffic Control and Surveillance System in the Shing Mun Tunnels

Project Description: To assist with the replacement of the traffic control and surveillance system in the Shing Mun Tunnels, Ozzo provided extensive traffic consulting services which include design of all required temporary traffic management schemes and liaison closely with relevant authorities including the Transport Department, Hong Kong Police Force and Highways Department. Projects: Contract No. 1005EM11 –…

Bus Rapid Transit (BRT) Network Study in Macao

Project Description: Ozzo provided traffic consulting services for a comprehensive conceptual planning of the rapid bus network in Macau and proposed effective short term bus network to be implemented before the commissioning of the new light rail system. The key elements for the study include bus travel demand study, bus route planning, selection bus stop locations,…